{"id":357,"date":"2025-12-04T06:13:21","date_gmt":"2025-12-04T06:13:21","guid":{"rendered":"https:\/\/www.hiderekmining.com\/?p=357"},"modified":"2026-05-09T02:23:55","modified_gmt":"2026-05-09T02:23:55","slug":"hyderics-second-assembly-workshop-put-into-operation","status":"publish","type":"post","link":"https:\/\/www.hiderekmining.com\/tr\/hyderics-second-assembly-workshop-put-into-operation\/","title":{"rendered":"Hyderic'in \u0130kinci Montaj At\u00f6lyesi Faaliyete Ge\u00e7ti"},"content":{"rendered":"<div data-page-id=\"UgHOfqrpSd9OSYcfHGpcZInOn6c\" data-lark-html-role=\"root\" data-docx-has-block-data=\"false\">\n<h2 class=\"ace-line ace-line old-record-id-BgdYfwYC3dYJ5fck28gc4N4Vngd\">Hyderic'in ikinci montaj at\u00f6lyesi ge\u00e7ti\u011fimiz g\u00fcnlerde resmen faaliyete ge\u00e7ti.<\/h2>\n<p class=\"ace-line ace-line old-record-id-BgdYfwYC3dYJ5fck28gc4N4Vngd\">Bu geli\u015fme, \u015firketin b\u00fcy\u00fck madencilik ekipmanlar\u0131 imalat\u0131 alan\u0131ndaki \u00fcretim kapasitesinde \u00f6nemli bir s\u0131\u00e7ramay\u0131 i\u015faret ediyor. 20.000 metrekarelik bir alan\u0131 kapsayan at\u00f6lye, b\u00fcy\u00fck konik k\u0131r\u0131c\u0131lar\u0131n, \u00e7eneli k\u0131r\u0131c\u0131lar\u0131n ve komple \u00fcretim hatt\u0131 ekipmanlar\u0131n\u0131n montaj\u0131 ve devreye al\u0131nmas\u0131na odaklan\u0131yor. 7.000 metrekarelik ilk montaj at\u00f6lyesiyle tamamlanan bu yeni at\u00f6lye sayesinde, \u015firketin temel montaj kapasitesi neredeyse 3 kat artt\u0131.<\/p>\n<div class=\"ace-line ace-line old-record-id-VfZKfSxR4dSJ6Scr5fKc1GiCnVe\">Yeni at\u00f6lyenin, b\u00fcy\u00fck ekipmanlar\u0131n montaj do\u011frulu\u011funu 0,05 mm'ye kadar kontrol edebilen geli\u015fmi\u015f otomatik montaj hatlar\u0131 ve ak\u0131ll\u0131 test sistemleriyle donat\u0131ld\u0131\u011f\u0131 ve devreye alma verilerinin ger\u00e7ek zamanl\u0131 olarak Ar-Ge merkezine senkronize edildi\u011fi bildiriliyor. Hyderic'in bir \u00fcretim m\u00fcd\u00fcr\u00fc, at\u00f6lyenin faaliyete ge\u00e7mesinin ard\u0131ndan, b\u00fcy\u00fck \u00f6l\u00e7ekli komple k\u0131rma ekipmanlar\u0131n\u0131n teslimat s\u00fcresinin 45 g\u00fcnden 25 g\u00fcne inece\u011fini ve bunun da k\u00fcresel m\u00fc\u015fterilerin b\u00fcy\u00fck \u00f6l\u00e7ekli madencilik \u00fcretim hatlar\u0131na y\u00f6nelik acil ihtiya\u00e7lar\u0131n\u0131 daha iyi kar\u015f\u0131layabilece\u011fini s\u00f6yledi. \u015eirket, iki ana \u00fcretim \u00fcss\u00fcn\u00fcn sinerjik avantajlar\u0131ndan yararlanarak, madencilik makineleri imalat sekt\u00f6r\u00fcndeki pazar konumunu daha da g\u00fc\u00e7lendirecek.<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Hyderic'in ikinci montaj at\u00f6lyesi yak\u0131n zamanda resmen faaliyete ge\u00e7ti ve bu da \u015firketin b\u00fcy\u00fck madencilik ekipmanlar\u0131 imalat\u0131 alan\u0131ndaki \u00fcretim kapasitesinde \u00f6nemli bir geli\u015fmeyi i\u015faret ediyor. 20.000 metrekarelik bir alan\u0131 kapsayan at\u00f6lye, b\u00fcy\u00fck konik k\u0131r\u0131c\u0131lar\u0131n, \u00e7eneli k\u0131r\u0131c\u0131lar\u0131n ve komple \u00fcretim hatt\u0131 ekipmanlar\u0131n\u0131n montaj\u0131 ve devreye al\u0131nmas\u0131na odaklan\u0131yor. [&hellip;]<\/p>","protected":false},"author":1,"featured_media":422,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-357","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/www.hiderekmining.com\/tr\/wp-json\/wp\/v2\/posts\/357","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hiderekmining.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hiderekmining.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hiderekmining.com\/tr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hiderekmining.com\/tr\/wp-json\/wp\/v2\/comments?post=357"}],"version-history":[{"count":1,"href":"https:\/\/www.hiderekmining.com\/tr\/wp-json\/wp\/v2\/posts\/357\/revisions"}],"predecessor-version":[{"id":1848,"href":"https:\/\/www.hiderekmining.com\/tr\/wp-json\/wp\/v2\/posts\/357\/revisions\/1848"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hiderekmining.com\/tr\/wp-json\/wp\/v2\/media\/422"}],"wp:attachment":[{"href":"https:\/\/www.hiderekmining.com\/tr\/wp-json\/wp\/v2\/media?parent=357"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hiderekmining.com\/tr\/wp-json\/wp\/v2\/categories?post=357"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hiderekmining.com\/tr\/wp-json\/wp\/v2\/tags?post=357"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}